For contractors, builders & the trades

Quotes Take You All Weekend. Bids Don't Wait That Long.

While your estimate sits in a pile on the kitchen table, the homeowner is comparing the two numbers that already arrived. We measure your real quote turnaround — then fix the lag.

Score Your Quote Turnaround

Free · 10 questions · about 3 minutes · scored 0–100 with a written report

The Weekend Quote Pile, Measured

At Quotes 63, we measure the road an estimate request actually travels at your business — how long until it's acknowledged, how long until a number goes out, how many times a quiet customer hears from you after. Then we fix the slowest mile.

  • Scored 0–100 with a written report
  • Monthly cost of quote lag, from your own numbers
  • $500 first fix: the quote-ack installed, before/after timestamps
  • Fixes scoped from measurements — from $2,500

Score Your Quote Turnaround

Where Bids Actually Die

Why Bids Die

The acknowledgment gap, the measuring backlog, the kitchen-table bottleneck, and the quote nobody follows up — mechanically explained.

The Math

Requests × miss rate × close rate × job value. At trade job sizes, a slow week of quoting is real money.

The First Fix

$500: your quote flow baselined with test requests, the fix built and running, before/after in writing — inside a week.

The First Number In Usually Wins

In a live appointment business we measure, inquiries that got a fast response reached a booking at nearly three times the rate of ones that waited — 29.7% vs 10.9%. And the waiting leads weren't worse: once responded to and booked, they closed at 67%.

A homeowner collecting bids works the same way. It's rarely your price that loses. It's your lag.

Score Your Quote Turnaround

The Proof Behind the Numbers

Built & running
We built a working voice-to-bid system for a dock builder: he records a walkthrough on his phone, and a priced estimate comes back for his review — his evenings stopped being quote night.
29.7% vs 10.9%
Fast-response inquiries vs waiting inquiries reaching a booking, in 13 months of a live business's own measured records.
0 templates
Every report's written analysis is produced from your answers only — by Claude, an AI model, and we say so.
$500 · $2,500
Prices on the page: the first fix (built and proven) $500, full builds from $2,500. No call required to learn a price.

Measured findings come from a live outpatient medical practice we work with — different trade, same physics of waiting. Your numbers will differ; that's the point of measuring yours.

Answers to the questions owners ask

From the measurement desk

Should I Quote from Photos or See the Job First?

Should you quote from photos or insist on seeing the job first? Learn when each method works, how to protect yourself, and what to ask before you price.

From the measurement desk

How do I follow up on a quote a customer hasn't answered?

Quote follow up timing, templates, and the rule that decides when to send. Day 2, day 5, day 10 scripts ready to use. Free score or $500 installed.

From the measurement desk

How should a customer compare contractor quotes fairly?

A quote comparison template helps customers weigh bids fairly. Get the side-by-side sheet you can hand out today, plus how to build your own.

From the measurement desk

What should a construction estimate template include?

A construction estimate template includes line items, labor, materials, markup, and payment terms. Get the complete template ready to fill in and use today.

From the measurement desk

What should a quote acceptance form say?

A quote acceptance template must capture signature, scope confirmation, payment terms, and start date. Here's the complete form you can use today.

From the measurement desk

Should a contractor charge for a quote?

Do contractors charge for quotes? Yes, when the estimate takes more than an hour or needs a site visit. Here's the rule and the exact wording to use.

From the measurement desk

How do I track the quotes I've sent so none go quiet?

A quote tracker template is a sheet that logs every quote with its send date and follow-up rule. Here's the layout and rule you can use today.

From the measurement desk

How long should it take to get an estimate from a contractor?

Learn how long does it take to get an estimate from a contractor. Get the turnaround window to promise customers and the message to send while you build the quote.

From the measurement desk

How do I send quotes faster without cutting corners?

Learn the quote-in-one-sitting method to send a faster quote without rushing. Includes a ready-to-use template and measured findings from live businesses.

From the measurement desk

A quote request came in Friday at 5pm — do I answer it before Monday?

A quote request came in Friday at 5pm — do I answer it before Monday? Yes. Here's why weekend quotes win jobs and how to send them without working weekends.

All answers →

Find Out What Quote Lag Costs You

Score Your Quote Turnaround